Project Description
LOGISTICS CENTER OF THE TIRE COMPANY MICHELIN HELLAS SA IN AVLONA
Tire storage and handling building with an area of 9,000 m2, as well as office and mechanical spaces with a total area of 1,000 m2.
The load-bearing structure (columns, perimeter beams) and the outer walls up to a height of 2 m are made of reinforced concrete, while from 2 m and above polyurethane panels have been installed.
The building was covered with sheet metal, stone wool and waterproofing membrane.
The load-bearing structure of the roof is a combination of concrete beams and metal cross-sections, designed so that the building has the minimum number of columns and therefore ideal use of storage space.